CO129-295 - Public Offices - 1899 — Page 161

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

05382

Race

Food 21 SEP 25

159

13 Queen Anne's Gate,

Westminster,

London, S.W.

18th September 1899.

Proposed New Law Courts Hong Kong

Further details...

MEMORANDUM.

We have sufficient information to prepare the whole of the architectural details for the exterior of this building.

We have also sufficient for the interior generally but we should be glad to know the kind of woods that would be preferred for the joinery in the various rooms and courts. Also the material of which it is proposed to construct the staircases and whether any other material than ordinary plaster would be used for the finishing of walls and plastering.

The constructive iron work we have already prepared the details for.

With regard to the sanitary work we should be glad to be supplied with the number of urinals, closets and lavatory basins that may be considered necessary in each block and generally the sort of fitting preferred and if hot water is required to any of them.

With regard to the heating we should be glad to have the temperature required for the rooms with a given temperature outside, and also the rooms that it is considered should be artificially heated.

It would also be useful to know when arranging the boiler power

Edit History

2026-05-31 11:50:55 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
05382 Race Food 21 SEP 25 159 13 Queen Anne's Gate, Westminster, London, S.W. 18th September 1899. Proposed New Law Courts Hong Kong Further details... MEMORANDUM. We have sufficient information to prepare the whole of the architectural details for the exterior of this building. We have also sufficient for the interior generally but we should be glad to know the kind of woods that would be preferred for the joinery in the various rooms and courts. Also the material of which it is proposed to construct the staircases and whether any other material than ordinary plaster would be used for the finishing of walls and plastering. The constructive iron work we have already prepared the details for. With regard to the sanitary work we should be glad to be supplied with the number of urinals, closets and lavatory basins that may be considered necessary in each block and generally the sort of fitting preferred and if hot water is required to any of them. With regard to the heating we should be glad to have the temperature required for the rooms with a given temperature outside, and also the rooms that it is considered should be artificially heated. It would also be useful to know when arranging the boiler power
Baseline (Original)
05382 Race Food 21 SEP 25 159 13 Queen Anne's Gate, Westminster, London, S.V. 18th September 1899. Proposed New Law Courts Hong Kong Further for details the new buildings .. MEMORANDUM. We have sufficient information to prepare the whole of the architectural details for the exterior of this building. We have also sufficient for the interior generally but of woods that would be preferred should be glad to know the kind Also the for the joinery in the various rooms and courts. material of which it is proposed to construct the staircases and whether any other material than ordinary plaster would be used for the finishing of walls and plastering. The constructive iron work we have already prepared the details for. With regard to the sanitary work we should be glad to be supplied with the number of urinals, closets and lavatory basins that may be considered necessary in each block and generally the sort of fitting preferred and if hot water is required to any of them. With regard to the heating we should be glad to have the temperature required for the rooms with a given temperature out- and also the rooms that it is considered should be artificially heated. side It would also be useful to know when arranging the boiler 21- power
2026-05-31 11:50:55 · Baseline
View content

05382

Race

Food 21 SEP 25

159

13 Queen Anne's Gate,

Westminster,

London, S.V.

18th September 1899.

Proposed

New Law

Courts

Hong Kong

Further

for details

the

new

buildings

..

MEMORANDUM.

We have sufficient information to prepare the whole of the architectural details for the exterior of this building.

We have also sufficient for the interior generally but

of woods that would be preferred should be glad to know the kind

Also the for the joinery in the various rooms and courts. material of which it is proposed to construct the staircases and whether any other material than ordinary plaster would be used for the finishing of walls and plastering.

The constructive iron work we have already prepared the

details for.

With regard to the sanitary work we should be glad to be supplied with the number of urinals, closets and lavatory basins that may be considered necessary in each block and generally the sort of fitting preferred and if hot water is required to any of

them.

With regard to the heating we should be glad to have the temperature required for the rooms with a given temperature out- and also the rooms that it is considered should be

artificially heated.

side

It would also be useful to know when arranging the boiler

21-

power

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.